PridLED - Custom LED Sign Manufacturer
Factory floor

Our Factory

LED Sign Factory in China — OEM Custom Sign Manufacturer

From your approved drawing to a packed sign: engineering review, fabrication, LED assembly and shipment checks for B2B projects.

PridLED manufacturing facility campus
20+
Years in Sign Manufacturing
500+
Custom Sign Projects
30+
Countries Supplied
2,000 m²
Manufacturing Facility

PridLED manufactures illuminated and non-illuminated signs, from mini letters and channel letters to neon, infinity mirror and storefront signs. Our drawing review process connects your design brief to materials, construction and production.

We work with sign shops, contractors, distributors and brand teams. Every project starts with an approved production drawing —not a guess. You review dimensions, materials, lighting, mounting and cable routing before fabrication begins.

Our facility combines laser cutting, CNC routing, metal fabrication, welding, paint finishing and LED assembly under one roof. This means we control quality at every step —from the first cut to the final packed crate.

Production Process

12 Steps From Fabrication to Final Packing

These are the stages an illuminated sign moves through in our workshop. Exact steps vary by sign type and construction.

Panel & Base Plate Engraving
01

Panel & Base Plate Engraving

Base panels and backing plates engraved to specification.

Laser Cutting
02

Laser Cutting

Letter shapes and components precision-cut from sheet material.

Trim Grooving
03

Trim Grooving

Grooves cut for trim caps and clean edge transitions.

Laser Welding
04

Laser Welding

Metal returns and seams joined by laser welding.

Weld Seam Grinding
05

Weld Seam Grinding

Welds ground smooth for invisible, seamless surfaces.

Metal Spraying & Baking Finish
06

Metal Spraying & Baking Finish

Paint applied and baked for durable, even color finish.

LED Mounting on Base Plate
07

LED Mounting on Base Plate

LED modules positioned and secured on backing panels.

Circuit Soldering & Pre-light Test
08

Circuit Soldering & Pre-light Test

Circuits soldered and pre-tested before final assembly.

Assembly & Reinforcement
09

Assembly & Reinforcement

Components assembled, reinforced and structurally checked.

Power-on Lighting Test
10

Power-on Lighting Test

Full illumination test —brightness, consistency and function.

Surface Cleaning
11

Surface Cleaning

Sign surfaces cleaned and inspected before packing.

Protective Packaging & Shipment
12

Protective Packaging & Shipment

Protective packing, labeling and grouping for export.

Inside Our Factory

The Workshop in Action

Manufacturing workshopMetal fabricationWelding stationFinishing lineAssembly benchQuality inspection

Client Visits

We Welcome Clients to Our Factory

Clients from sign shops, contractors and brands around the world visit our facility to review production, quality control and discuss custom projects.

Client visiting PridLED factory production floor
Customer factory tour reviewing LED sign samples
International client meeting in PridLED showroom
Client inspecting finished channel letter products
Customer discussion about custom sign project
Client visiting PridLED assembly workshop

Quality Control

Six Points We Review Before Shipment

Agree the review points for your project: dimensions, finish, illumination, supplied hardware and packing. We document each check before the sign leaves the factory.

Discuss Your Project
  • Drawing Review: construction, dimensions and installation inputs
  • Fabrication: sign bodies, components and surface finish
  • LED Assembly: module layout, wiring and cable exits
  • Inspection: visible finish and agreed functional checks
  • Packing: protection, hardware and shipment scope
  • Documentation: applicable records and project information

Compliance

Certifications & Compliance Records

Selected supplier and component records. Confirm the holder, scope and project applicability with us.

ISO 9001:2015 Certificate

ISO 9001:2015

Quality Management System

ISO 14001:2015 Certificate

ISO 14001:2015

Environmental Management

SGS LVD Verification Report

SGS LVD Report

LED Component Testing

CE Declaration

CE / RoHS

Component Compliance

Want to See Our Factory in Action?

Send us your project details —we'll share production photos and updates as your signs are built.