
Wholesale LED Sign Manufacturer | Factory Direct | OEM/ODM
Custom LED Channel Letters & Signs
Built to Your Drawing, Delivered Globally
Backlit letters, mini letters, flat channel letters, super 3D letters, neon signs, mirror infinity signs & custom storefront signs.
One-stop service from design & prototyping to production & after-sales support.
1 piece minimum — no drawing needed, we can redraw your sketch or photo.
Product Range
Custom Signs We Manufacture

Front Lit Channel Letters
Bright illuminated face for storefront visibility.
View Details →
Mini Channel Letters
Small premium letters for reception walls.
View Details →
Reverse Halo Lit Letters
Backlit glow for offices & hotels.
View Details →
LED Neon Signs
Flexible neon, 50,000+ hour lifespan.
View Details →
Marquee Bulb Letters
Vintage bulb letters for events & hospitality.
View Details →
LED Light Box Signs
Aluminum cabinet signs for storefronts.
View Details →
Non-Illuminated Letters
Stainless steel & acrylic dimensional signs.
View Details →
Infinity Mirror Signs
3D depth mirror signs for brand walls.
View Details →Why Choose Us
Why Buy Direct From Our Factory

Drawing-Controlled Production
Every sign built to approved drawings — no guesswork.

In-House Full Process
Laser cutting, welding, painting, assembly all under one roof.

One-Stop OEM/ODM Service
From artwork review to after-sales support — end to end.

Wholesale for Global Clients
Serving sign shops and brands in 30+ countries worldwide.
Common Problems We Solve
Tired Of Signs That Don't Last?
Uneven Glow & Hot Spots
Cheap signs have bright spots and dark areas. We use high-quality LED modules with proper spacing for even, uniform illumination.
Fading & Discoloration
Cheap paint fades in 1-2 years. We use powder coating rated for 5+ years outdoor use, with proper UV protection.
Water Damage & Shorts
Poor waterproofing leads to failures. We use IP65 rated seals, waterproof connectors and proper drainage design.
Complicated Installation
Hard-to-install signs cost extra labor. We provide detailed mounting templates and support for your installer.
Workflow
One-Stop Workflow From Artwork to Delivery
01
Artwork Review
Send artwork, dimensions & quantity.
02
Engineering Confirmation
Approve drawings, mounting & wiring.
03
Prototyping & Production
Build sample, then full production run.
04
QC Inspection
Check dimensions, finish & illumination.
05
Global Delivery
Export-packed, shipped to your destination.
Production
12-Step Precision Manufacturing
Every sign moves through the same 12 stages in our factory — from laser cutting to export packing. Exact sequence matches our production floor.

Panel Engraving
Base panels engraved to specification.

Laser Cutting
Letter shapes precision-cut from sheet.

Trim Grooving
Grooves for trim caps and clean edges.

Laser Welding
Metal returns and seams joined.

Weld Grinding
Welds ground smooth and invisible.

Paint & Bake
Durable color finish, baked on.

LED Mounting
LED modules positioned on base plates.

Solder & Pre-Test
Circuits soldered and pre-tested.

Assembly
Components assembled and reinforced.

Lighting Test
Full power-on illumination check.

Surface Clean
Signs cleaned and inspected.

Pack & Ship
Protective packing for export.
Portfolio
Recent Projects & Production Examples
Our Work
Real Projects & Installation Process
Actual installed signs from customers in 30+ countries, plus on-site installation process. Not stock photos - real factories, real installations.










Compliance
Certified Components & Export Standards
Core LED modules, power supplies and materials used in our signs are backed by recognized component-level certifications. Export-ready packing for safe global delivery.

ISO 9001:2015

ISO 14001:2015

CE / RoHS

SGS LVD Report
Trusted Worldwide
We Work With Sign Makers & Brands In 30+ Countries






What Our Clients Say










FAQ
Questions Buyers Often Ask
Application guides
Guides by type of premises
Each guide covers the specification logic, the failure modes and the installation conditions for that type of premises.
Channel Letters for Restaurants
Front-lit or halo build, sized from the road, with oil and salt-air material choices.
Read guide →Channel Letters for Hotels
Halo-lit facades, stone anchoring and a finish that survives close inspection.
Read guide →Channel Letters for Retail Storefronts
Trimless or trim-cap faces, Pantone control and multi-site repeatability.
Read guide →Channel Letters for Clinics
Glare control, 3000-4000K colour and a separate tactile wayfinding layer.
Read guide →Channel Letters for Gyms
Night-first sizing, RGB scenes and mirror-safe interior letters.
Read guide →Channel Letters for Bars & Nightclubs
Halo or face-lit letters, neon accents and DMX scenes for late hours.
Read guide →Get a Quote
Free artwork review · Free cost estimate · Custom solution for your project
AI / EPS / SVG / PDF artwork accepted





