
Custom Neon Signs — Wholesale, Direct From the Factory
Flexible illuminated lettering and shapes on custom-cut acrylic backing. Energy-efficient LED neon that lasts 50,000+ hours —no glass, no fragile tubes.

Professional Neon Sign Wiring & Safety Standards
All our LED neon signs are pre-wired in our factory with 12V low-voltage drivers, grounded connections and waterproof rated wiring suitable for outdoor use. We include detailed wiring diagrams, mounting hardware and step-by-step installation guides for sign shops and contractors, eliminating on-site wiring errors and reducing installation time by 50%.
Gallery
LED Neon in Detail












What Are LED Neon Signs?
LED neon signs use flexible silicone tubing with embedded SMD LEDs to replicate the look of traditional glass neon —without the fragility, high voltage or heat. They are energy-efficient, shatter-resistant and available in a wide range of colors and custom shapes.
Modern LED neon is the standard for retail, hospitality, weddings and home decor. It can be shaped into letters, logos, illustrations or decorative patterns and mounted on clear acrylic, black acrylic or wall directly.
LED Neon vs Traditional Glass Neon
Safety: LED neon runs on 12V DC —no high-voltage transformer, no fragile glass tubes. Safe for indoor and event use.
Durability: Silicone tubing withstands shipping and handling. No gas leakage or broken tubes.
Energy use: LED neon consumes 70% less power than traditional neon and lasts 50,000+ hours.
Customization: Flexible LED tubing can bend into almost any shape or font, making it ideal for logos and decorative designs.

Neon Options
What We Make

Cut-to-Shape Neon
Flexible LED neon bent to your artwork on cut acrylic backing.

Script & Cursive
Flowing script lettering for bars, cafés and boutiques.

Logo & Shapes
Your brand logo or custom shapes in glowing LED neon.

RGB Color-Changing
Remote-controlled color-changing neon with dynamic effects.
Start Your Project
What the Specification Must Fix
Send your artwork or even a hand-drawn sketch. We'll handle the rest.
Send Your Details- Artwork: logo, text or reference photo (AI, EPS, SVG, PDF)
- Approximate dimensions: width and height
- Color preference: warm white, cool white, pink, blue, etc.
- Indoor or outdoor use
- Power supply location: hidden, plug-in, or direct wire
- Destination country and delivery timeline
In Our Factory
How LED Neon Signs Are Made

Bending silicone neon tube to artwork

Power-on test before packing
Specifications
Standard Specs
| Tube Diameter | 8mm / 11mm / 16mm silicone LED neon |
| Backing | Clear / frosted / colored acrylic (3mm–5mm) |
| LED Lifespan | 50,000+ hours, 12V DC, IP67 rated |
| Color Options | Warm white, cool white, red, blue, green, pink, yellow + RGB |
| Power Supply | 110–120V / 220–240V AC → 12V DC adapter |
| Installation | Wall mount standoffs / Hanging / Freestanding |
| Warranty | 2 years |
| Components | CE / RoHS / UL approved LED strips and power adapters |
| Lead Time | 5–10 working days |
| Shipping | Sea freight / Air freight / Express (DHL, FedEx) |
| Packing | Bubble wrap + foam + export carton |
Not sure which type?
Which Sign Type Is Right For You?
Industry Knowledge
Related Guides & Articles

LED Neon Sign Scope: Tube and Zone Count
What drives the cost of a custom LED neon sign, and how to compare two quotations.
Read More →
Neon Mounting Options
Wall, backer and freestanding systems, and what to prepare before the sign arrives.
Read More →
Outdoor Neon Signs
IP ratings, sealing, backing and cold-weather performance for exterior installations.
Read More →
Bars & Nightclubs
Facade letters, neon accents, DMX scenes and service access for late-night venues.
Read More →FAQ
Neon Questions
Ready for a Neon Sign That Glows?
Send your idea — script, logo or shape — and we will answer with the specification questions that matter.
Application guides
Where LED neon is used
Each guide covers the specification logic, the failure modes and the installation conditions for that type of premises.
Wholesale Neon Signs for Shops
Samples from one piece, mixed-size cartons, colour locked to a chip.
Read guide →Neon Signs for Bars
Interior neon, dimming that follows the room, suspension over the bar.
Read guide →Channel Letters for Bars & Nightclubs
Halo or face-lit letters, neon accents and DMX scenes for late hours.
Read guide →Neon Signs for Restaurants
Window signs read side-on, wall slogans sized for photos, and grease-resistant panels near the kitchen.
Read guide →

