Installation Process — Restaurant
SPICY GOOSE Restaurant Sign Installation

Project Details
- Country
- USA
- Dimensions
- Channel letters, total sign width: 2.4m
- Materials
- Aluminum return, acrylic face, LED modules
- Lighting
- Front-lit, warm white 3000K
- Mounting
- Wall mounted on storefront facade
- Quantity
- 1 set
Challenge
Client needed help with on-site installation guidance for their local contractor.
Our Solution
We provided detailed installation drawings, video call guidance, and marked all wiring connections. Local electrician handled final power connection.
Outcome
Sign installed in 1 day, client was very satisfied with the final result. Installation photos provided by client.