The drawing has to survive a tender, not just a workshop
School projects are usually procured through a process that expects documentation: a specification, a drawing set, evidence of certification, and an installation method that a facilities department can accept. A factory that works only from photographs and WhatsApp is difficult to put through that process.
What we prepare for institutional work is a package rather than a product: dimensioned shop drawings with mounting heights and anchor types, a specification sheet naming materials and finishes, electrical load and driver information for the project electrician, and the certification documents that the authority usually asks for. Where the project needs a sample or a first article before the order is released, that is treated as a production item rather than a special case.
It also helps to state exclusions plainly - what the school's contractor supplies, what we ship, and which site tasks remain. Tender documents that leave that ambiguous come back as variations later.
Reading distance at school-zone speed
School signage is read at 30-50 km/h on approach, often by a parent who has never been there before and is looking for a turning point rather than a brand. That is slower than a retail arterial, so letters can be smaller than a supermarket fascia and still work: 300-600 mm at the gate, 600-1,000 mm on the main building.
The complication is that school names are long and often include a type - Primary, Secondary, Academy, College, Campus - in smaller type that seems reasonable in a logo file and disappears from a car. The practical rule is to set the distinguishing word at full height and the descriptor at no less than 60% of it, then check the whole line at the actual approach distance rather than on a screen.
Campus sites add a second layer: the building identification that gets a visitor from the gate to the right block. Those letters are read at walking distance and can be much smaller, but they need to be consistent with the main sign - same typeface, same colour family, same night behaviour - or the campus reads as three unrelated buildings.
Egress, fire and the letter that must not become an obstruction
Schools have constraints that retail facades do not. Letters cannot project into an egress route, cannot reduce the effective width of a corridor, and cannot be mounted where they would block a fire door or a refuge area. Interior signage in a hall or a gym is reviewed against the same drawings as the building's life-safety strategy.
Materials matter here too. Where a project specifies non-combustible construction on an interior sign, foam-backed letters and PVC substrates are out, and the answer is aluminium, steel and a face material the spec allows. That conversation should happen before the design is fixed, because a change from foam to aluminium alters weight, fixing pattern and sometimes the letter profile.
Exterior letters on a canopy or over an entrance also need a maintenance route that does not involve standing in a pupil drop-off zone. The service plan belongs in the drawing set, not in the handover conversation.
Balls, bags, bikes and marker pens
A school facade is used harder than most commercial walls. Balls hit it, bags lean against it, bikes are parked against it, and a certain number of students will test whether the letters can be reached.
Four details hold up over a school generation. Security-head fixings, so a face cannot be unscrewed with a coin. Faces that can be replaced individually rather than as a whole set, because vandalism is usually one letter. An anti-graffiti clear coat on painted returns, which allows solvent-free cleaning without repainting, and welded return corners rather than folded ones where a letter sits within reach.
Where a sign sits in a genuinely exposed position - a sports field entrance, a bike shelter - a non-illuminated dimensional letter is often the better answer than an illuminated one: fewer components, nothing to break, and repainting is a brush job rather than a removal and refit.
The summer window, and the term that follows
School installations happen in a narrow window: after the last exam, before induction. A sign that arrives in September is a sign that waits until the next summer, and a phased campus project can drift by a year at a time.
Production planning for a school programme works backwards from that window rather than forwards from the order. Drawings are approved in the spring term, production is scheduled against the holiday dates, and delivery is split by building so the installer is not storing six crates in a corridor. Where a project has an immovable opening date, the sequence is agreed with the contractor and written into the order.
The term that follows is the test of the specification. A sign that needs a scissor lift for every module swap, or a face that cannot be replaced without a crane, will not be maintained by a school facilities team. Accessibility at the drawing stage is what keeps the sign looking right in year eight.
What the facilities team inherits
Every school sign is handed to someone who did not specify it. The business manager knows there is a sign, the caretaker knows there are three boxes of spare parts somewhere, and the electrical contractor who installed it has moved on. The signs that age well are the ones designed for that reality.
A handover pack for a school should include the as-built drawing with fixing positions, the module map, a photograph of each letter lit, the driver locations and the circuit labels that match the distribution board. Where a spare face or a module set ships, it should be labelled by letter number and stored in a place the caretaker can find in two years, not in the crate it arrived in.
Cleaning is the weekly contact point. Most school signs are washed with whatever the window cleaner uses, and solvent degreasers will craze an acrylic face. A one-page cleaning note - mild soap, no solvents, no pressure washer within a metre - survives longer than a manual, because it can be laminated and left in the caretaker's cupboard.
Finally, the failure plan. A single dark letter at a school is usually noticed by a parent before it is noticed internally. Knowing which letter number it is, who to call and what information to send turns a two-week repair into a replacement module in the post.




