ENGINEERING / MANUFACTURING · BUYER GUIDE
A brief is only as good as the information behind it. Send artwork, dimensions, quantity and installation context together, and the reply can be a firm scope. Send "how much for a sign like this" with a JPEG, and the reply is a guess dressed as an answer.
This guide covers what to send, what the factory should send back, and how to tell a design proof from a production drawing - the three documents that decide whether a sign gets built correctly.
Artwork that preserves the geometry
A vector file (AI, EPS, SVG or PDF with outlines) is what the factory needs to evaluate stroke width, letter spacing, joins and small details. A reference image showing the intended appearance helps, but it is not a specification.
If only a raster image exists, say so, and whether redraw work is expected. Provide at least one reliable overall dimension so the drawing can be scaled rather than invented. Redrawing a logo without a dimension reference is how a sign arrives 40% too small.
Explain what the sign must do
State the product type, illuminated or non-illuminated, interior or exterior, and the viewing context - street distance, façade height, whether it is read from a car or walked past. Include finish preferences and any brand standard.
A reference photograph communicates an effect. It does not communicate return depth, LED layout, face material or mounting method, and those are where the real work lives.
Show the site and the interfaces
Send a wide site photograph plus close-ups of the mounting area. State the wall material if known, the likely cable route, available power, and whether existing holes or supports must be reused.
Mark what is unknown as unknown. The installer confirms site-specific dimensions and conditions before construction release; a factory that quietly assumes a concrete wall will build something that does not fit a plasterboard fascia.
Make the commercial assumptions visible
State quantities by design or location, the destination country, the required delivery date, and the scope you expect the factory to cover. Separate fabrication, transport and local installation - the three are scoped very differently.
For repeat programs, identify the prototype and the later batches separately. Ask the supplier to list its unresolved assumptions, because a scope with no stated assumptions cannot be compared to another.
What the factory should send back
A useful reply contains three distinct documents, and they are not interchangeable:
- Design proof - settles visible intent: wording, logo proportions, arrangement, colour references, relationship to the architecture.
- Production drawing - settles physical construction: materials, thicknesses, depths, assembly details, fixing positions, cable exits, maintenance access.
- Mounting template - transfers the drawing to the wall: hole positions and a scale reference the installer can measure from.
Approval of one does not approve the others. A proof with correct proportions can sit next to a drawing with an unbuildable stroke width.
Trace changes between the two documents
A visual change usually has a construction consequence. A narrower stroke reduces the space available for LEDs and can make the letter unlit at the joint. A deeper return changes stand-off distance and mounting load.
When artwork changes, review the fabrication impact and issue a matching production revision - not just a new presentation file. Programs that update the proof only end up building the old construction with the new look.
Approval status and open items
Every drawing should carry a revision and a status: for comment, appearance approval, or manufacturing release. Superseded versions must be kept outside the active production package, or two versions of the truth end up on the factory floor.
List open items with an owner and a date: unconfirmed site dimension, landlord approval, electrical supply confirmation, buyer-supplied hardware. An approval should never silently convert unknown conditions into factory assumptions.
Are shop drawings the same as permit drawings?
No. A shop drawing describes the sign the factory will supply. Permit or structural submissions may need additional work by qualified local professionals - wind load calculations, electrical permits, landlord submissions - depending on the project and jurisdiction.
Brief checklist
| Input | Why it matters |
|---|---|
| Vector artwork | Stroke width, spacing, small details, joins |
| Dimensions and quantity | Size scaling, LED layout, packing |
| Product type and appearance | Construction, face material, illumination |
| Site photographs | Mounting method, cable route, access |
| Power information | Driver selection, voltage, control |
| Destination and date | Compliance, freight mode, scheduling |
| Scope split | Fabrication vs transport vs installation |
| Open decisions | Honest assumptions instead of hidden ones |
What a complete reply looks like
A brief that produces a usable reply follows a fixed order: what is visible, what is physical, what is electrical, what is logistical. Missing any one of them pushes the answer back to a question, and each round trip costs a week before the factory has even opened a drawing.
The reply should state scope boundaries rather than totals. A concise response names the parts it covers - letters, returns, faces, illumination, drivers, mounting hardware, crating - and names what it does not cover, such as permits, freight beyond the agreed term, or site labour. Two suppliers listing different boundaries are not comparable on any single number.
| What you sent | What a complete reply should contain |
|---|---|
| Vector artwork | Confirmation that stroke widths and joins are buildable, or a redrawn outline for approval |
| Dimensions and quantity | Letter height, return depth, and the set count the drawing is based on |
| Site photographs | Mounting method, fixing positions, and the maintenance access route |
| Power information | Voltage, driver location, and the connection boundary |
| Destination and date | Compliance path, crate plan, and the production window measured from drawing release |
If a reply arrives without those five rows answered, the brief is still incomplete — not the factory.
Frequently asked questions
Can a brief be sent before the final dimensions are known?
Yes. Supply your best estimate and label it provisional. The reply should state which assumptions must be confirmed before construction is finalized.
Can one document serve as both proof and production drawing?
Yes, when it clearly contains both appearance information and construction detail. The approval status must still state what you are authorizing.
Who prepares the shop drawings?
Either the factory or the sign shop, but agree who authors them, who verifies site inputs and who approves the final revision. Two authors producing two versions is the usual failure.
What if the landlord rejects the design after approval?
Treat it as a new revision, not a comment. Record what changed, re-check the construction impact, and re-release before production continues.
Related resources
How Channel Letters Are Made · Site Photo Requirements for Channel Letters · How to Choose a Sign Manufacturer · Sourcing Custom Signs From China
Have a drawing set? Send it with the site photo and we will return the construction scope with its assumptions listed.


