ABOUT PRIDLED
A Custom Sign Factory Built Around Drawing-Controlled Production
PridLED supports overseas sign shops, contractors, brand teams and commercial developers with engineering review, fabrication, inspection and export packing.
- Custom illuminated and non-illuminated signage
- One-set prototype and repeat-order support
- Factory evidence available during production


FACTORY & EXPERIENCE
Engineering Inputs Stay Connected to the Production Floor
The manufacturing workflow covers CNC and laser processing, metal fabrication, acrylic work, painting, assembly, wiring, illumination testing, dimensional inspection and protective packing.
- 2,000 m² production facility
- 20+ years of sign industry experience
- Commercial sign projects shipped to 30+ countries
- 500+ completed custom projects
FACTORY PROFILE
Manufacturing Facts for Buyer Review
These operating facts describe the production scope behind custom LED sign and dimensional-letter projects.
| Production Area | 2,000 m² production facility |
|---|---|
| Industry Experience | 20+ years in custom sign manufacturing |
| Main Products | Channel letters, LED neon, light boxes, dimensional letters and custom logo signs |
| Export Markets | Commercial sign projects supplied to 30+ countries |
| Manufacturing Focus | Drawing review, material processing, fabrication, electrical assembly, inspection and export packing |
PRODUCTION PROCESS
Manufacturing Steps Buyers Can Understand
Each stage has a clear relationship to the production drawing and final installer handover.
01 · MATERIAL RECORD
Material Processing
CNC, laser cutting, engraving, bending, punching and acrylic processing follow the approved drawing.
02 · FABRICATION RECORD
Fabrication & Finish
Welding, grinding, edge finishing, painting and structural assembly are completed for the selected construction.
03 · ELECTRICAL RECORD
Electrical Assembly
LED modules, wiring, drivers and cable exits are installed around voltage and service-access requirements.
04 · HANDOVER RECORD
Inspection & Packing
Dimensions, finish, illumination, hardware and packing are checked before shipment handover.
INSPECTION & HANDOVER EVIDENCE
Checks Buyers Can Review Before Shipment
Real production evidence can help buyers review electrical assembly, packing preparation and project handover before shipment.

Electrical Assembly & Inspection
LED layout, cable routing and connection points can be reviewed during assembly before the sign is released for packing.

Packing & Project Handover
Finished components, hardware and packing references are organized before shipment according to the confirmed project scope.
COMPLIANCE & PROJECT CONFIDENCE
Documentation That Supports Project Review
Selected quality, environmental and product compliance records are available to support buyer evaluation, engineering coordination and project documentation requirements.
Documented management records supporting controlled production and review.
Relevant compliance records can be reviewed during quotation and project coordination.
Original documents are available for buyers to review when relevant to the project.
SELECTED COMPLIANCE RECORDS

ISO 9001:2015

ISO 14001:2015

SGS LVD Verification

RoHS Certificate

CE Certificate

EC Declaration of Conformity
START A PROJECT WITH THE FACTORY
Talk With Our Manufacturing Team About Your Sign Project
Share your artwork, quantity, installation requirements and destination. We’ll review the project through engineering, production planning and quotation.
