FOR SIGN SHOPS & PARTNERS

Add Production Capacity Without Adding Local Fabrication

Use confidential factory-direct manufacturing for overflow projects, one-set prototypes and repeat programs while your team retains the client relationship and installation scope.

  • White-label production and unbranded packing
  • One-set prototype before repeat production
  • Approved drawings retained for reorder control
Unbranded packing and grouped hardware prepared for partner production

PARTNER SUPPORT

A Production Extension for Your Sign Business

Use PridLED for overflow capacity, specialist fabrication or repeat programs without adding another local production line.

01

Confidential Manufacturing

Your client-facing relationship remains separate from factory production. Packing and project documents can remain unbranded.

02

Low-Volume Project Support

A one-set custom order or prototype can be produced before a rollout or repeat program.

03

Drawing & Interface Review

Mounting, cable exits, voltage, service access and loose hardware are confirmed before fabrication.

04

Repeat-Order Control

Approved drawings, finish references, components and packing notes become the reorder reference.

WHITE-LABEL HANDOVER

Production Records Stay With the Partner Relationship

Confidential manufacturing and unbranded handover keep the production record organized under the partner project reference.

  • Unbranded packing and partner-controlled project references
  • Location labels and grouped installation hardware
  • Approved drawing, finish and repeat-order notes
Laser cutting capacity used for confidential partner production

PARTNER WORKFLOW

Keep Customer Management Local and Production Controlled

The process is designed around clear project references, approvals and confidential handover.

PROJECT INPUT

Submit Project Files

Send artwork, dimensions, quantity, destination and site notes under your project reference.

REVIEW

Review & Quote

Missing construction, mounting or electrical inputs are identified before quotation.

APPROVAL

Approve the Reference

Confirm the production drawing and, where required, a one-set physical prototype.

HANDOVER

Receive Labeled Handover

Signs, templates, hardware and packing are organized for your installation team.

PARTNER FAQ

Questions From Sign Shops and Agencies

Clarify confidentiality, prototypes, repeat orders and shipping before sending a partner RFQ.

Can the shipment and documents remain unbranded?

Yes. Unbranded packing and project references can be used when confidentiality is requested before order confirmation.

Can I order one set before committing to repeat production?

Yes. One-set prototype support is available for construction, finish, illumination and packing approval.

Can approved drawings be reused for later orders?

Yes. The drawing, component choices, finish reference and packing notes can be retained under a consistent project code.

Can different projects be consolidated for shipping?

Consolidation can be reviewed according to production timing, carton dimensions, destination and the protection required for each sign type.

OEM PARTNER SUPPORT

Start an OEM or Repeat-Production Sign Program

Share your drawings, expected quantities, white-label requirements and repeat-order needs. We’ll review the production setup and support model for your program.