PROJECT RFQ

Send Your Drawings for an Engineering Review

Share your current project information, even if the production artwork is not final. We review dimensions, quantity, destination, voltage and installation conditions before quotation.

  • File upload is optional; PDF, JPG, PNG or ZIP up to 20 MB
  • Initial engineering review within 1–2 business days
  • One-set prototype requests accepted
Engineering illustration showing a custom sign drawing reviewed for quotation

CONTACT & RESPONSE

What Happens After Submission

Your files and project notes are reviewed together. If dimensions, mounting, voltage or delivery inputs are missing, we will request clarification before preparing the quotation.

Initial review within 1–2 business days. Files are used only for quotation and engineering review.

Direct Contact

Prefer to share larger files? Message our engineering contact on WhatsApp. Factory visits are available by appointment.

Required: Name, company, work email, country, product type and project description. File upload is optional.

File privacy: Uploaded files are used only for quotation and engineering review.


OUR RESPONSE PROCESS

A Clear Path From RFQ to Production Approval

The quotation process is designed to surface missing technical inputs before they become production changes.

01

Submission Check

Confirm uploaded files, contact details and the basic project scope.

02

Engineering Review

Identify missing dimensions, construction, mounting, voltage or site information.

03

Quotation & Drawing Scope

Define the proposed construction, inclusions and any drawing or prototype requirements.

04

Approval Before Production

Release fabrication only after the production reference and commercial terms are confirmed.

RFQ FAQ

Questions Before You Submit

You can start with incomplete files. Use these answers to decide what to include now.

Can I request a quotation without final production artwork?

Yes. Send the best artwork and dimensions currently available. We will identify whether redrawing, vector conversion or additional site information is required before production.

Can I upload several files together?

Yes. Place AI, EPS, SVG, photos, drawings and related documents in one ZIP archive up to the form upload limit.

What installation information is most useful?

Include the mounting surface, available depth, power access, cable route, destination voltage, site photos and any landlord or local approval constraints.

How are uploaded files used during project review?

Artwork, drawings and site photos are reviewed together with the project notes to identify missing dimensions, construction, mounting, voltage or delivery inputs before quotation.