IN-HOUSE MANUFACTURING

Custom Sign Fabrication Controlled by Approved Drawings

Process metal, acrylic, faces, returns, backs, frames, illumination and finishes through coordinated production stages.

  • CNC, laser, bending, welding and finishing
  • LED, wiring and driver assembly
  • One-off custom and repeat-production workflows
Laser cutting and material processing workshop for custom signs

INPUT · PROCESS · OUTPUT

A Defined Handover for This Capability

Each capability begins with controlled information and ends with a record or production output the next stage can use.

01 · INPUT

Required Project Input

Approved production drawing, material schedule, finish reference and component selection.

02 · PROCESS

Controlled Work

Process, form, fabricate, finish, assemble and wire the required sign components.

03 · OUTPUT

Stage Output

Completed sign transferred to inspection with production-stage references available by project.

CONTROL POINTS

Manufacturing Stages Linked to the Drawing

Each process works from the same dimensions, materials, finish notes and assembly references.

01

Material Processing

CNC cutting, laser cutting, engraving, punching, bending and acrylic routing.

02

Metal Fabrication

Forming, welding, grinding, edge finishing and structural assembly.

03

Surface Finish

Painting, polishing, brushing and project-specific finish preparation.

04

Face & Acrylic Work

Cutting, forming, bonding, engraving and face-retention preparation.

05

Electrical Assembly

LED placement, wiring, drivers, controllers and cable-exit preparation.

06

Trial Assembly

Check fit, sections, access panels and removable components before packing.

WORKFLOW

Production Moves Only After the Previous Output Is Ready

Each stage produces an input or record used by the next production decision.

Production Release

Approve drawings, materials, finishes and components.

Process Components

Cut, form, weld, route and finish the required parts.

Assemble & Wire

Build the sign, install lighting and prepare mounting hardware.

Transfer to Inspection

Submit finished products and records for dimensional and functional checks.

BUYER EVIDENCE

Records Available for Project Review

Production photos and dimensional references can document the progress of custom orders.

  • Material and component processing photos
  • Fabrication and assembly-stage photos
  • Illumination and wiring references
  • Section-fit and pre-packing photos

CAPABILITY FAQ

Questions About Manufacturing

Clarify the information, records and decisions involved in this stage.

Which manufacturing processes are completed in-house?

The workflow includes CNC and laser processing, metal fabrication, acrylic work, painting, assembly, wiring, illumination testing and packing. Exact scope depends on the selected product.

Can PridLED manufacture one custom set?

Yes. One-off custom production and one-set prototypes are supported.

How is repeat production controlled?

Approved drawings, material and finish references, component selections and project codes are reused for later production.

RELATED TECHNICAL GUIDES

Related Technical Guides

Use only the guides that directly support this page’s product, capability or application decisions.

DRAWING RELEASE

Artwork & File Preparation Guide

Confirm the production references that control geometry, scale, color and site interface.

Relevant context: approved inputs before fabrication

CONSTRUCTION CHOICE

Front-Lit vs Halo-Lit Channel Letters

Connect the selected lighting effect to returns, backs, stand-offs and wall conditions.

Relevant context: channel letter construction and finish

SHIPMENT HANDOVER

Export Packaging Checklist

Carry part identification, surface protection and accessory grouping through to packing.

Relevant context: finished-product protection and project records

START YOUR PROJECT

Send Your Drawings for an Engineering Review

Share your artwork, dimensions, quantity, destination and installation notes. We will identify missing project inputs before preparing the quotation.