FAQ & CHECKLISTS
Custom Sign Buyer FAQ and Project Checklists
Use the FAQ and technical checklists to prepare a clearer RFQ, drawing review and installer handover.
- Artwork, dimension and site-input checklist
- Product, mounting and voltage questions
- Packing and international delivery references

PROJECT CHECKLISTS
Open the Guide That Matches Your Current Stage
The same information used in these checklists can be submitted through the RFQ form.
COMMON QUESTIONS
Answers Before You Prepare an RFQ
Use these answers to identify the files and site information needed for review.
Can I submit an RFQ before every checklist item is complete?
Yes. Submit the information available and identify uncertain items. The review will list the missing inputs required before quotation or production.
Do I need final vector artwork for an initial quotation?
Not always. A clear image and approximate dimensions may support an initial review, but production artwork and dimensions must be confirmed before fabrication.
Can PridLED recommend a mounting method?
Options can be reviewed from site photos, wall material, access and sign construction. Final local installation responsibility remains with the installer and relevant project parties.
Are product specifications fixed?
No. The specification tables are starting points. Final materials, dimensions, components and documentation are confirmed for the actual project.
PROJECT-SPECIFIC SUPPORT
Need an Answer Based on Your Actual Project?
If the answer depends on artwork, dimensions, mounting, voltage or destination, send the available project information and we’ll review it directly.
