TECHNICAL GUIDES
Practical Guides for Sign Drawings, Mounting, Power and Packing
Use these guides to prepare the inputs that affect fabrication, installation and international shipment.
- Artwork and file-preparation checklist
- Mounting and voltage planning references
- Export packing handover checklist

CHANNEL LETTER ENGINEERING
Channel Letter Engineering
Compare illumination and mounting decisions that change fabrication, wall interfaces and installer handover.
Front-Lit vs Halo-Lit Channel Letters
Compare face illumination, reflected halo light and the construction behind each effect.
Relevant context: channel letter signs; retail and hospitality façades
Raceway vs Flush-Mount Channel Letters
Review wall penetrations, wiring access, serviceability and visible support conditions.
Relevant context: channel letter signs; storefront and rollout projects
DRAWINGS & PROJECT INPUTS
Project Inputs & Drawing Review
Prepare controlled artwork, dimensions, finish references and site information before the drawing is released.
Artwork & File Preparation Guide
Build an RFQ package that makes geometry, scale, color and site assumptions clear.
Relevant context: all custom sign products; repeat and one-off projects
INSTALLATION & ELECTRICAL
Mounting & Power Planning
Coordinate the sign-to-site interface, driver access and field responsibilities before fabrication.
Channel Letter Mounting Guide
Define studs, raceways, rails, stand-offs, cable exits and installer deliverables.
Relevant context: channel letter signs; retail façades and landlord conditions
LED Sign Voltage & Power Planning
Separate destination input, low-voltage circuits, driver placement and cable routes.
Relevant context: channel letters, LED neon and light boxes
PACKAGING & DELIVERY
Export Packaging & OEM Handover
Protect finished products while keeping hardware, electrical parts and multi-location sets traceable.
Export Packaging Checklist
Match surface protection, carton or crate choice, labels and records to the actual construction.
Relevant context: OEM and sign-shop shipments; franchise and multi-location programs
ENGINEERING SUPPORT
Need Help Applying the Guide to Your Project?
Share your dimensions, mounting, voltage, materials or drawing questions for a project-specific engineering review.
